电脑头部左边文字

Welcome to Shanghai Leader Catalyst Co., Ltd.

电脑头部右边文字

电脑logo

电脑底部导航

电脑底部信息

Address: 288 Jinhuan Steet, Jinshan District, Shanghai, China
Tel:+86-21-57292444    Fax:+86-21-57292553     Web:www.leadercata.cn
Copyright:Shanghai Leader Catalyst Co., Ltd.      沪ICP备05018542号      Powered by www.300.cn

电脑底部图标

电脑内页关于立得标题

ABOUT LEADER
>
Enterprise Development History
Oct. 2000   Completed the front-end preparations for company establishment 
Jan. 2001    Official establishment of Shanghai Leader Catalyst Company Limited
Mar. 2001   Construction commencement
June 2001   Completed the construction of first solid Magnesium and Titanium series production line
July 2001    Successfully developed first product of SCG-1 catalyst with proprietary intellectual property rights and produced                   first batch of qualified products, which won Leader’s first customer---Maoming Petrochemical.
Dec. 2002   Products were marketed to overseas market (Indonesia)
Dec. 2002   Passed Shanghai Municipal High-tech Enterprise certification 
Feb. 2003   Successfully developed BP Innovene gas phase technology applicable SLC-icatalyst, thusly becoming the                               exclusive catalyst supplier for BP
Mar. 2003   Second production line---solid Magnesium Titanium series production line was completed and put into operation
June 2003   Third production line—domestic slurry catalyst production line was completed and put into operation
Dec. 2003   Developed China first slurry catalyst SLC-S with proprietary intellectual property rights and successfully put it                       into trial, thusly filling the gap in China
Dec. 2003   Leader was granted with Excellence Award of China Patent issued by State Intellectual Property Office for the                       patent of PE catalyst preparation with gas phase technology
Sept. 2006  The first set of slurry catalyst system independently developed by Leader achieved successful trial together with                     Leader’s SLC-S catalyst 
May 2007   Fourth production line—bi-modal catalyst production line was completed and put into operation
June 2007   Fifth production line—chromium series catalyst production line was completed and put into operation
Sept. 2009  Sixth production line—imported (Denmark) slurry catalyst production line was completed and put into operation
Dec. 2009  The slurry catalyst feedingsystem developed by Leader attained authorization of the National Patent Office, thusly                  becoming the first set of patent equipment with domestic polyethylene technology
June 2011   Leader’s SLC-S catalyst was on trial at Shenhua Baotou 300 KTA coal chemical PE plant for the first time. This                    was also the first trial of domestic slurry catalyst at coal chemical market, which had accumulated valuable                          experience for subsequent development of coal chemical market. 
Feb. 2014   Groundbreaking and construction commencement for “Integral relocation, capacity expansion and upgrading                        construction project (new base) of Shanghai Leader Catalyst Company Limited”
Nov. 2015   First batch of two production lines at Leader’s new base were completed and started with commissioning. First                     batch of products were produced on November 8. 
Dec. 2015   All units at old base were shut down, demolition and relocation were started step by step in an orderly way. 
Dec. 2015   As Leader’s shareholder and technical supporter, Shanghai Research Institute of Chemical Industrywas granted                     with the title of “National Key Laboratory of Polyolefin Catalysis Technology and High Performance Materials”by                   state Ministry of Science and Technology.
April 2016   Leader’s registered address was changed from “Qianwei Town, Jinshan District, Shanghai ” to “288 Jinhuan                        Road, Jinshanwei Town, Jinshan District, Shanghai”.